Description
Concrete Epoxy, Glue, Coating Removing HTC Quick Lock PCD Grinding Shoes
●Desighned for concrete floor restoration, epoxy, glue and any other concrete floor coating removal
●Used on Universal floor grinding machine
Used for removing all types of coatings such as paint, varnish, glue, epoxy, acrylic, screed residue, VCT mastic, black tar adhesive as well as thick rubber materials on the concrete floor.
Applications: suitable for general (concrete,stone) grinding use while mostly they are used for paint, glue, epoxy removal and floor coating, high quality and high efficiency, long lifespan.
Coarse grit: 16#,24#,30#,36#.
Could be used for un-even concrete floors , rough grinding preparation on floor or old floor renovation.
Medium grits: 46#, 50/60# , 60/80#, 100#
Could be used for all kinds of concrete and terrazzo floors , grinding preparation on floor or old floor renovation.
Fine grits: 120#, 150#, 180#, 200#, 270#
Could be used for all kinds of concrete and terrazzo floors , find grinding preparation on floor or old floor renovation before polishing.
Advantage:
1) Combination of superior diamonds and an extremely durable and unique matrix
2) Removes stock quickly and efficiently to greatly reduce your product and labor cost
3) Lasts much longer than competitive products and will not glaze
4) Amazing results on most types of concrete from soft to very hard
Features:excellent wear resistance, lower cost, better surface finish etc.
Product Name: HTC Fast Change Diamond PCD Grinding Pads with Five Quarter PCD and Single Rectangle Grinding Bar
Material: Diamond Segment + PCD + Metal Blank
MOQ: 12 Pieces/Set
PCD/Segment Sizes:
1/4 PCD*5T (Five Quarter PCD)
40*10*5mm*1T (One Rectangle Shape Segment)
PCD/Segment Quality: Top Quality
Connection:HTC Quick Lock Connection
Machine: HTC Floor Grinding Machine
Segment Grits: 16#
Quality: International Standard Quality
Application: Concrete and Terrazzo Floor
Q: What is the MOQ?
A: The MOQ is 9 PCS (One Set)
Q: What about the Lead Time?
A: For 1-10 Sets, the Production Time is about One Week. Mass Production Time is Need about 1-2 Weeks.
A: Yes. Please inform us formally before our production.
Q: How do you ship the goods and how long does it take to arrive?
A: For Not More Than 2 KG, We Usually Ship by China Post Air Mail or ePacket, It need about 10-25 Days. And for More Than 2 KG, We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.